Please wait a minute...
Acta Metall Sin  1983, Vol. 19 Issue (3): 135-140    DOI:
Current Issue | Archive | Adv Search |
SAFETY INSPECTION VERSUS PREMATURE "POP-IN" OF RAIL OR WHEEL STEELS
by DONG Renze (China Academy of Railway Sciences; Beijing)
Cite this article: 

by DONG Renze (China Academy of Railway Sciences; Beijing). SAFETY INSPECTION VERSUS PREMATURE "POP-IN" OF RAIL OR WHEEL STEELS. Acta Metall Sin, 1983, 19(3): 135-140.

Download:  PDF(630KB) 
Export:  BibTeX | EndNote (RIS)      
Abstract  An investigation was carried out on the premature "pop-in" events of rail or wheel steels. It was shown that these are caused by the segregation of elements such as Si, Mn, S, etc. in steels used. The probability of the premature "pop-in" event, p, may be: p=10.08-4.8534lg K_(Q1) where K_(Q1) donotes the specified fracture toughness. The proposal seems to be made that (1-p) is available for the reference of their safety inspection.
Received:  18 March 1983     
Service
E-mail this article
Add to citation manager
E-mail Alert
RSS
Articles by authors

URL: 

https://www.ams.org.cn/EN/     OR     https://www.ams.org.cn/EN/Y1983/V19/I3/135

No related articles found!
No Suggested Reading articles found!